Time Limits / Maintenance Checks - Airworthiness Limitation Section / Maintenance Program - Revision / Main Landing Gear Assembly - Reidentification
- Published
- Effective
- Deadline
AI-generated summary of the official EASA document. Verify against the PDF before acting.
What to do
Operators must revise their maintenance programs within 90 days of the effective date to include the updated life-limited item tasks. They must also inspect maintenance records within the same timeframe and submit inspection results as instructed. Reidentification of specified Main Landing Gear parts must be completed before or during the next overhaul or upon removal, and installation of the listed parts is prohibited after the directive's effective date.
Summary
Brazilian Airworthiness Directive AD No. 2021-08-01 issued by the Agência Nacional de Aviação Civil (ANAC) applies to Yaborã Indústria Aeronáutica S.A. ERJ 190-100 ECJ airplanes, serial numbers 19000109 through 19000732. This directive addresses maintenance program revisions and reidentification of certain Main Landing Gear Assembly parts to ensure proper life limits and structural integrity. It mandates compliance with updated maintenance tasks and record inspections for affected aircraft.
What changed
This new directive introduces requirements to revise the approved maintenance program by incorporating Temporary Revision 9-2 of the Maintenance Planning Guide 2928 Appendix A, verify maintenance records per Embraer Service Bulletin 190LIN-32-0039, and reidentify specific Main Landing Gear parts before or during the next overhaul. It also prohibits installation of certain part numbers on the affected aircraft model after the effective date.
Why it matters
The directive ensures that life-limited components in the Main Landing Gear are correctly identified and maintained according to their specific operational loads, preventing potential structural integrity issues. This is critical for operators and maintenance organizations to maintain airworthiness and comply with regulatory safety standards. Proper compliance avoids unsafe installations and supports continued safe operation of the ERJ 190-100 ECJ fleet.
More for Embraer ERJ 190
All 54- EASA AD BR-2026-07-02Engine Pylons DrainageJul 28, 2026
- EASA AD BR-2026-07-01SUPERSEDED BY ANAC BRAZIL AD 2026-07-02Jul 28, 2026
- EASA SIB 2026-03Embraer EMB-135, EMB-145, ERJ 170 and ERJ 190 aeroplanes - Radio Altimeters - 5G Interference SusceptibilityApr 14, 2026
- EASA AD BR-2012-08-03R1Cockpit Door Passive Lock Striker - Quick Release Pin and Hinges / ReplacementJan 20, 2026
- EASA AD BR-2026-01-01Engines Operation in Ground Freezing Fog - Operational Limitations Revision
Get the next one by email
New ADs and bulletins for Embraer ERJ 190 and Yaborã ERJ 190-100 ECJ, summarized like this page, every Monday.