Fire Protection – Fire-extinguishing Pipes – Replacement
- Published
- Takes effect
- Deadline
AI-generated summary of the official EASA document. Verify against the PDF before acting.
What to do
Operators of Airbus A380-861 aeroplanes with EA GP7200 engines must replace the affected fire-extinguishing pipes within 72 months from 4 December 2026, following the procedures in Airbus Service Bulletin A380-26-8011. After replacement, installation of the affected parts is prohibited. Alternative methods of compliance may be approved by EASA if properly substantiated.
Summary
EASA Airworthiness Directive 2026-0224 is an airworthiness directive addressing fire-extinguishing pipes on Airbus A380-861 aeroplanes equipped with EA GP7200 engines. It mandates the replacement of specific fire-extinguishing pipes located in the core zone of each of the four engine pylons. The directive aims to ensure continued safety and airworthiness of affected aircraft by mitigating a risk related to pipe cracking.
What changed
This new airworthiness directive introduces a requirement to replace fire-extinguishing pipes with part number L2621011100200 due to cracking caused by excessive vibrations. Airbus has developed an improved fire-extinguishing pipe with part number L2621090000000, which must be installed to address the unsafe condition. The directive provides instructions for replacement via Airbus Service Bulletin A380-26-8011.
Why it matters
This directive is critical for aviation professionals because cracked fire-extinguishing pipes can reduce the effectiveness of the engine fire-extinguishing system, potentially compromising safety during an engine fire. Operators, maintenance organizations, and compliance teams must ensure timely replacement to maintain regulatory compliance and aircraft safety. Failure to comply may result in grounding of aircraft or regulatory penalties.
More for Airbus A380
All 185- EASA AD 2026-0223Pneumatic – Pylon / Wing Interface Bleed Duct and Fuel Pipe – Inspection / Modification / ReplacementNov 20, 2026
- EASA AD 2026-0216Wings – Wing Mid Spars – InspectionNov 11, 2026
- EASA PAD 26-125Pneumatic – Pylon / Wing Interface Bleed Duct and Fuel Pipe – Inspection / Modification / ReplacementOct 15, 2026
- EASA AD US-2026-20-12Turbine - High-Pressure Turbine Interstage Seal - ReplacementOct 12, 2026
- EASA PAD 26-118Fire Protection – Fire-extinguishing Pipes – Replacement
Get the next one by email
New ADs and bulletins for Airbus A380, summarized like this page, every Monday.