Pneumatic – Pylon / Wing Interface Bleed Duct and Fuel Pipe – Inspection / Modification / Replacement
- Published
- Takes effect
- Deadline
- Replaces
- 2021-0280R1
AI-generated summary of the official EASA document. Verify against the PDF before acting.
What to do
Operators must perform repetitive inspections of the affected bleed-air ducts and fuel pipes within specified flight cycle or flight hour intervals depending on the aircraft group. Group 1 and 2 aeroplanes must modify the ducts and pipes with the interim mod within defined compliance times and replace all affected parts with serviceable redesigned parts within 50 months of the AD's effective date. Reporting inspection findings to Airbus within 30 days is required if discrepancies are found.
Summary
EASA Airworthiness Directive 2026-0223 addresses inspection, modification, and replacement requirements for the pneumatic pylon/wing interface bleed duct and fuel pipe on Airbus A380-841, A380-842, and A380-861 aeroplanes. It targets specific bleed-air duct assemblies with part numbers L3615006300000, L3615004800000, L3615004800100, and L3615006300100, requiring inspections and corrective actions to prevent potential fire hazards. The directive mandates replacing affected parts with redesigned serviceable parts to ensure continued airworthiness.
What changed
This directive supersedes EASA AD 2021-0280R1 and introduces mandatory replacement of all four affected bleed-air duct assemblies with redesigned parts featuring improved attachment brackets. It retains previous inspection and interim modification requirements while adding four missing Airbus modification approvals to the interim mod definition. The replacement of affected parts is now the terminating action for repetitive inspections.
Why it matters
This AD is critical for operators and maintenance organizations to prevent potential fire risks caused by bleed-air duct detachments and subsequent contact with fuel pipes. Compliance ensures aircraft safety by addressing a known failure mode that could lead to uncontrolled fires. It also provides clear guidance on inspection intervals, corrective actions, and part replacements, facilitating regulatory compliance and operational safety.
More for Airbus A380
All 185- EASA AD 2026-0224Fire Protection – Fire-extinguishing Pipes – ReplacementNov 20, 2026
- EASA AD 2026-0216Wings – Wing Mid Spars – InspectionNov 11, 2026
- EASA PAD 26-125Pneumatic – Pylon / Wing Interface Bleed Duct and Fuel Pipe – Inspection / Modification / ReplacementOct 15, 2026
- EASA AD US-2026-20-12Turbine - High-Pressure Turbine Interstage Seal - ReplacementOct 12, 2026
- EASA PAD 26-118Fire Protection – Fire-extinguishing Pipes – ReplacementSep 29, 2026
Get the next one by email
New ADs and bulletins for Airbus A380, summarized like this page, every Monday.