Electrical Power — Ram Air Turbine Gearbox — Inspection / Modification
- Published
- Effective
AI-generated summary of the official EASA document. Verify against the PDF before acting.
What to do
Affected operators and maintenance providers must perform the specified inspections and modifications on the ram air turbine gearbox as outlined in the document. They should review their maintenance schedules and ensure compliance within any stated deadlines. Documentation of compliance should be maintained for regulatory audits.
Summary
Electrical Power — Ram Air Turbine Gearbox — Inspection / Modification is a regulatory document concerning the Airbus A380 aircraft. It addresses inspection and modification requirements for the ram air turbine gearbox to ensure continued airworthiness and electrical power reliability during flight. The document applies specifically to the Airbus A380 type designation.
What changed
This document introduces mandatory inspection and modification procedures for the ram air turbine gearbox on Airbus A380 aircraft. It establishes new maintenance requirements aimed at identifying and correcting potential gearbox issues before they affect electrical power supply. The regulation is a new directive rather than an amendment to previous rules.
Why it matters
This document is critical for aviation professionals because it ensures the reliability of the ram air turbine, a vital backup electrical power source during emergencies. Operators and maintenance organizations must comply to prevent in-flight electrical failures that could compromise safety. Compliance teams need to update their maintenance programs to include these new inspection and modification tasks.
More for Airbus A380
All 182- EASA PAD 26-125Pneumatic – Pylon / Wing Interface Bleed Duct and Fuel Pipe – Inspection / Modification / ReplacementOct 15, 2026
- EASA AD US-2026-20-12Turbine - High-Pressure Turbine Interstage Seal - ReplacementOct 12, 2026
- EASA PAD 26-118Fire Protection – Fire-extinguishing Pipes – ReplacementSep 29, 2026
- EASA AD 2026-0181Power Plant – Air Intake Cowl – Nacelle Anti-ice Duct Female Socket – InspectionSep 18, 2026
- EASA AD 2016-0193R2
Get the next one by email
New ADs and bulletins for Airbus A380, summarized like this page, every Monday.