Propellers — Propeller Shaft Power Gearbox Flange / Dowel Bolt Nuts — Inspection / Torque Check
- Published
AI-generated summary of the official EASA document. Verify against the PDF before acting.
What to do
Affected stakeholders should contact the responsible military airworthiness authority to obtain the applicable AD for the Airbus A400M. They should follow the military AD requirements for inspection and torque checks of the propeller shaft power gearbox flange and dowel bolt nuts. No public compliance deadline is provided in this document.
Summary
The document titled 'Propellers — Propeller Shaft Power Gearbox Flange / Dowel Bolt Nuts — Inspection / Torque Check' is an informational Airworthiness Directive record related to the Airbus A400M aircraft. It clarifies that no civil Airbus A400M aircraft exist, so no public AD document is available. The document serves as a recommendation for military authorities to issue their own applicable ADs for this aircraft type.
What changed
This document introduces an advisory record rather than a formal AD, highlighting the absence of a public AD for the Airbus A400M due to its exclusive military use. It directs military airworthiness authorities to issue their own legally binding directives. No new inspection or torque check requirements are mandated by this document itself.
Why it matters
This matters because operators, maintenance organizations, and compliance teams dealing with Airbus A400M aircraft must rely on military-issued ADs rather than public civil aviation directives. Understanding this distinction ensures proper compliance and maintenance actions are taken according to the correct regulatory authority. It prevents confusion about the applicability of civil ADs to military aircraft.
More for Airbus Military A400M
All 68- EASA AD 2026-0159Fuselage – Ram Air Turbine Rod Assembly – InspectionAug 13, 2026
- EASA AD 2026-0150Lights – Emergency Power Supply Unit Battery Pack – Life Limit Implementation / Functional CheckAug 11, 2026
- EASA AD 2026-0019Fuselage — Ram Air Turbine Rod Assembly — InspectionJan 26, 2026
- EASA AD 2025-0293Fuselage — Inner Flange Glare Frames — InspectionDec 19, 2025
- EASA AD 2025-0026R1Oxygen — Full-Face Quick Donning Masks — Functional CheckOct 31, 2025
Get the next one by email
New ADs and bulletins for Airbus Military A400M and A400M, summarized like this page, every Monday.