Pneumatic – Bleed Air Leakage Detection System – Analysis / Inspection
- Published
AI-generated summary of the official EASA document. Verify against the PDF before acting.
What to do
Affected stakeholders should contact the responsible military airworthiness authority in their country to obtain the applicable military AD for the Airbus A400M. They should follow the legally valid requirements issued by that authority for bleed air leakage detection system analysis and inspection. No civil compliance deadlines are provided in this document.
Summary
The Pneumatic – Bleed Air Leakage Detection System – Analysis / Inspection document is an informational record created by EASA regarding the Airbus A400M aircraft. Since there are currently no Airbus A400M aeroplanes in civil service, no public Airworthiness Directive (AD) exists for this subject. The document clarifies that legally valid requirements are issued by the responsible military authorities for affected military aircraft.
What changed
This document introduces an informational Airworthiness Directive record without legally binding requirements for civil operators, as the Airbus A400M is not in civil service. It directs stakeholders to consult the applicable military AD issued by the relevant military authority for compliance obligations.
Why it matters
This matters because aviation professionals dealing with the Airbus A400M must recognize that compliance is governed by military airworthiness authorities rather than EASA for civil ADs. Operators, maintenance organizations, and compliance teams need to coordinate with military authorities to obtain and follow the applicable ADs for bleed air leakage detection system inspections.
More for Airbus Military A400M
All 71- EASA AD 2021-0268R1Flight Controls – Back-up Control Module and Power Supply – Operational Test / ReplacementOct 26, 2026
- EASA AD 2023-0061R1Nacelles / Pylons – Nacelle Panels – InspectionSep 29, 2026
- EASA AD 2026-0159Fuselage – Ram Air Turbine Rod Assembly – InspectionAug 13, 2026
- EASA AD 2026-0150Lights – Emergency Power Supply Unit Battery Pack – Life Limit Implementation / Functional CheckAug 11, 2026
- EASA AD 2026-0019Fuselage — Ram Air Turbine Rod Assembly — Inspection
Get the next one by email
New ADs and bulletins for Airbus Military A400M and A400M, summarized like this page, every Monday.