Fuselage – Ram Air Turbine Rod Assembly – Inspection
- Published
AI-generated summary of the official EASA document. Verify against the PDF before acting.
What to do
Affected stakeholders should contact their responsible military airworthiness authority to obtain the applicable military Airworthiness Directive for the Airbus A400M Ram Air Turbine Rod Assembly inspection. No civil compliance deadlines or actions are specified by EASA in this document.
Summary
The document titled 'Fuselage – Ram Air Turbine Rod Assembly – Inspection' is an informational Airworthiness Directive record issued by EASA concerning the Airbus A400M aircraft. Since there are currently no Airbus A400M aeroplanes in civil service, no public AD document exists. The document is intended for design approval holders and military airworthiness authorities responsible for the affected military aircraft.
What changed
This document introduces an informational record rather than a formal Airworthiness Directive because the Airbus A400M is not operated in civil aviation. It clarifies that legally binding requirements for the Ram Air Turbine Rod Assembly inspection are issued by the relevant military authorities depending on the country of registration.
Why it matters
This matters to aviation professionals because it highlights that compliance and inspection requirements for the Airbus A400M Ram Air Turbine Rod Assembly are governed by military airworthiness authorities, not EASA. Operators, maintenance organizations, and compliance teams must coordinate with their respective military authorities to obtain and follow the applicable directives.
More for Airbus Military A400M
All 68- EASA AD 2026-0150Lights – Emergency Power Supply Unit Battery Pack – Life Limit Implementation / Functional CheckAug 11, 2026
- EASA AD 2026-0019Fuselage — Ram Air Turbine Rod Assembly — InspectionJan 26, 2026
- EASA AD 2025-0293Fuselage — Inner Flange Glare Frames — InspectionDec 19, 2025
- EASA AD 2025-0026R1Oxygen — Full-Face Quick Donning Masks — Functional CheckOct 31, 2025
- EASA AD 2024-0241R1Fuselage - Frames / Inner Flange Couplings - InspectionSep 22, 2025
Get the next one by email
New ADs and bulletins for Airbus Military A400M and A400M, summarized like this page, every Monday.