Landing Gear — Main Landing Gear Hydraulic Hose Assemblies — Replacement
- Published
- Effective
- Deadline
- Replaces
- 94-095
- Replaces
- 2015-0077
AI-generated summary of the official EASA document. Verify against the PDF before acting.
What to do
Operators of affected Fokker F28 aeroplanes must replace all hydraulic hose assemblies with part numbers 97867-1 or 97867-3 by serviceable parts with part numbers A25509-01 or A25629-01 within 18 months of 24 May 2019. After replacement, installation of affected hose assemblies is prohibited. The replacement must follow the instructions in the applicable Fokker Services Service Bulletins.
Summary
EASA Airworthiness Directive 2019-0104 is an airworthiness directive addressing the replacement of main landing gear hydraulic hose assemblies on Fokker F28 aeroplanes, including Mark 0070, 0100, 1000, 2000, 3000, and 4000 models. The directive mandates replacing certain hose assemblies with updated parts featuring strengthened restrictor check valves to ensure safe landing gear operation.
What changed
This directive supersedes previous directives RLD AD (BLA) 94-095 and EASA AD 2015-0077 by cancelling their requirements and introducing a new mandatory replacement of affected hydraulic hose assemblies with serviceable parts that have improved filter screens. It updates the maintenance requirements to prevent hydraulic lock and landing gear extension failures caused by debris blockage.
Why it matters
Compliance with EASA Airworthiness Directive 2019-0104 is critical to prevent main landing gear collapse or failure to extend, which could lead to runway excursions and potential damage or injury. Operators and maintenance organizations must ensure the use of serviceable hose assemblies to maintain aircraft safety and regulatory compliance.
More for Fokker F28
All 36- EASA PAD 26-019Time Limits / Maintenance Checks — Airworthiness Limitations Section Part 2 —Airworthiness Limitations Items and Safe life Items — AmendmentFeb 2, 2026
- EASA AD 2025-0250Fuselage — Frame Inboard Boom — InspectionNov 10, 2025
- EASA AD 2024-0192Landing Gear — Main Landing Gear Piston — InspectionOct 10, 2024
- EASA AD 2024-0176Landing Gear – Main Landing Gear Piston – InspectionSep 11, 2024
- EASA AD 2024-0123Landing Gear — Hydraulic Line Restrictor Check Valve — Replacement
Get the next one by email
New ADs and bulletins for Fokker F28, summarized like this page, every Monday.