Main Rotor Drive - Main Transmission Drive Shaft Coupling - Inspection / Replacement
- Published
- Takes effect
- Deadline
AI-generated summary of the official EASA document. Verify against the PDF before acting.
What to do
Operators of affected MD Helicopters must perform a one-time visual inspection of the main transmission drive shaft coupling within 50 hours time-in-service or 6 months after November 27, 2026, whichever occurs first. If cracks are found, the coupling must be replaced before further flight. If no cracks are found, the coupling must be replaced within 300 hours time-in-service after the effective date.
Summary
Airworthiness Directive 2026-21-05 is a final rule issued by the FAA addressing certain MD Helicopters, LLC Model 369D, 369E, 369F, 369FF, 369H, and 500N helicopters equipped with main transmission drive shaft couplings part number 369H5660. The directive mandates a one-time visual inspection for cracks in the spline area of the coupling and requires replacement if cracks are found. This action aims to prevent potential coupling failure that could lead to loss of power to the main rotor and possible emergency autorotation.
What changed
This new airworthiness directive introduces a mandatory one-time visual inspection of the main transmission drive shaft coupling splines for specific MD Helicopters models. If no cracks are detected, the coupling must be replaced within 300 hours time-in-service. The AD removes previous references to material incorporated by reference, clarifying that none are required.
Why it matters
This AD is critical for aviation professionals because it addresses a manufacturing defect that could cause fatigue cracks leading to coupling failure and loss of main rotor power. Operators and maintenance teams must comply to ensure continued airworthiness and safety of affected helicopters. The directive provides clear inspection and replacement requirements to mitigate risk without imposing recurring inspections.
More for Md Helicopters Inc (Mdhi) 369
All 10- EASA AD US-2026-19-01[Correction] Rotorcraft flight control - Torque Tube Assembly and Roller Bearings - Replacement / InspectionOct 7, 2026
- EASA AD US-2025-17-11Rotors Flight Control - Tail Rotor Pedal Support Brackets - Repetitive InspectionsOct 9, 2025
- EASA AD US-2024-20-07Equipment / Furnishings - Emergency Float Kit Activation Handle - Repetitive Inspections / ReplacementNov 29, 2024
- EASA AD US-2024-23-06Rotorcraft Flight Control - Torque Tube Assembly and Roller Bearings - InspectionNov 20, 2024
Get the next one by email
New ADs and bulletins for these 13 aircraft types, summarized like this page, every Monday.