Windows – Passenger Cabin Window – Inspection
- Published
- Takes effect
- Deadline
AI-generated summary of the official EASA document. Verify against the PDF before acting.
What to do
Operators of affected AB139 and AW139 helicopters must perform a visual inspection of the six passenger cabin window seals within 25 flight hours from 4 December 2026, following Leonardo Alert Service Bulletin 139-887. If any seal is found installed incorrectly, it must be replaced with a new part before the next flight. Compliance with these actions is mandatory to continue operation.
Summary
EASA Airworthiness Directive 2026-0227 is an airworthiness directive addressing the inspection of passenger cabin window seals on Leonardo S.p.A. AB139 and AW139 helicopters. The directive applies specifically to helicopters with serial numbers listed in the AD and targets the six passenger cabin window seals, part number A417AG002WB. It mandates inspection and corrective actions to ensure proper installation of these seals.
What changed
This new airworthiness directive introduces a mandatory inspection requirement for the passenger cabin window seals on affected AB139 and AW139 helicopters. It addresses the issue of reversed installation of the seals during production, which does not conform to the certified design. The AD requires visual inspection within 25 flight hours and replacement of any incorrectly installed seals before further flight.
Why it matters
This directive is critical for aviation professionals because incorrect installation of the passenger cabin window seals could lead to window detachment, posing safety risks including potential damage to the helicopter and injury to people on the ground. Operators, maintenance organizations, and compliance teams must ensure timely inspections and corrective actions to maintain airworthiness and regulatory compliance.
More for Leonardo S.P.A. Helicopters AB139
All 47- EASA AD 2020-0271R1Main Rotor – Swashplate Boot – InspectionOct 8, 2026
- EASA AD 2025-0094R2Electrical Power – Overhead Panel Wires Interference – Inspection / ModificationAug 26, 2026
- EASA AD 2026-0165Engine Exhaust – Nozzle Exhaust Duct Clamp Assembly – InspectionAug 18, 2026
- EASA AD 2025-0094R1Electrical Power – Overhead Panel Wires Interference – Inspection / ModificationJul 3, 2026
- EASA AD 2026-0003Time Limits / Maintenance Checks — Airworthiness Limitations Section — Amendment
Get the next one by email
New ADs and bulletins for Leonardo S.P.A. Helicopters AB139, S.P.A. Helicopters AW139, AB139 and AW139, summarized like this page, every Monday.