EASA AD 2026-0112
Fuel – Fuel Shut-off Valve – Inspection / Replacement
Summary
Fuel – Fuel Shut-off Valve – Inspection / Replacement is a maintenance document applicable to the GROB AIRCRAFT SE:G 109 type designation. It provides instructions and requirements for inspecting and, if necessary, replacing the fuel shut-off valve on this specific aircraft model. The document aims to ensure the continued airworthiness and safe operation of the G 109 by addressing potential issues with the fuel shut-off valve.
What Changed
This document introduces inspection and replacement procedures for the fuel shut-off valve on the GROB AIRCRAFT SE:G 109. It establishes criteria for identifying valve conditions that require replacement to maintain safety standards. The document serves as a new maintenance guideline rather than an amendment to previous regulations.
Why It Matters
Ensuring the proper function of the fuel shut-off valve is critical for flight safety and operational reliability. For operators and maintenance organizations, adhering to these inspection and replacement requirements helps prevent fuel system failures that could lead to in-flight emergencies. Compliance teams benefit from clear guidance to meet regulatory and safety obligations.
What To Do
Operators and maintenance personnel should perform the inspections and replacements as outlined in the document for the GROB AIRCRAFT SE:G 109 fuel shut-off valve. They must follow the specified procedures to detect any valve defects and replace components as necessary. No explicit compliance deadlines are stated, so actions should be integrated into regular maintenance schedules.
Your fleet's weekly compliance brief
AI-summarized regulatory changes, compliance deadlines, and action items — filtered to your aircraft, every Monday.
AI-generated summary from official EASA source document. Always verify against the original.