Electrical Power — Direct Current Emergency Electrical Network Contactor 1PA — Operational Test
- Published
- Effective
AI-generated summary of the official EASA document. Verify against the PDF before acting.
What to do
Affected operators and maintenance teams should perform the operational test on the Direct Current Emergency Electrical Network Contactor 1PA as outlined in the document. They must integrate these procedures into their maintenance programs to ensure compliance and maintain aircraft safety. No specific compliance deadline is provided.
Summary
Electrical Power — Direct Current Emergency Electrical Network Contactor 1PA — Operational Test is a regulatory document applicable to ATR42 and ATR72 aircraft types. It addresses the operational testing procedures for the Direct Current Emergency Electrical Network Contactor 1PA to ensure proper functionality and safety of the aircraft's emergency electrical power system.
What changed
This document introduces operational test requirements for the Direct Current Emergency Electrical Network Contactor 1PA on ATR42 and ATR72 aircraft. It specifies the procedures to verify the correct operation of this critical electrical component during emergency power situations.
Why it matters
This matters to aviation professionals because ensuring the reliable operation of the emergency electrical network contactor is vital for aircraft safety during power failures. Operators and maintenance organizations must comply to maintain airworthiness and prevent electrical system failures that could compromise flight safety.
More for ATR ATR42
All 70- EASA PAD 26-119Oxygen – Oxygen Pressure Regulator – InspectionOct 2, 2026
- EASA AD 2026-0185Flight Controls – Angle of Attack Probes – Functional ChecksSep 29, 2026
- EASA PAD 26-097Flight Controls – Angle of Attack Probes – Functional ChecksAug 27, 2026
- EASA AD 2026-0046Landing Gear — Landing Gear Selector Valve — Functional CheckMar 6, 2026
- EASA AD 2026-0038Air Conditioning — Integrated Air System Control — ModificationFeb 26, 2026
Get the next one by email
New ADs and bulletins for ATR ATR42, ATR72, 42 and 72, summarized like this page, every Monday.