Landing Gear — Main Landing Gear Anti-Skid Harness Installation — Inspection
- Published
- Effective
AI-generated summary of the official EASA document. Verify against the PDF before acting.
What to do
Operators and maintenance teams should perform the specified inspections on the main landing gear anti-skid harness installation as outlined in the directive. They must follow the inspection procedures carefully and document compliance accordingly. Any discrepancies found during inspection should be addressed promptly to maintain airworthiness. No explicit compliance deadlines are stated in the document.
Summary
The document titled 'Landing Gear — Main Landing Gear Anti-Skid Harness Installation — Inspection' is a regulatory directive concerning the SAAB AB:2000 aircraft type. It addresses the inspection requirements for the installation of the main landing gear anti-skid harness to ensure proper functionality and safety. This directive is intended to maintain the airworthiness of the affected aircraft by verifying the integrity of critical landing gear components.
What changed
This directive introduces mandatory inspection procedures for the main landing gear anti-skid harness installation on the SAAB AB:2000 aircraft. It specifies the inspection criteria and methods to detect any installation issues that could compromise the anti-skid system's performance. The document establishes new inspection requirements rather than amending previous regulations.
Why it matters
Ensuring the correct installation and condition of the main landing gear anti-skid harness is vital for safe landing operations and preventing brake system failures. For operators and maintenance organizations, compliance with this directive helps avoid potential safety risks and regulatory penalties. It also supports continued airworthiness and operational reliability of the SAAB AB:2000 fleet.
More for Saab Ab 2000
All 12- EASA AD 2023-0220Time Limits / Maintenance Checks — Airworthiness Limitations Section — AmendmentDec 21, 2023
- EASA AD 2023-0135Landing Gear — Main Landing Gear Anti-Skid Harness Installation — ModificationJul 10, 2023
- EASA AD 2021-0132Time Limits / Maintenance Checks – Airworthiness Limitations Section – AmendmentMay 25, 2021
- EASA AD 2020-0223Landing Gear — Transfer Valve Installation — ModificationOct 14, 2020
- EASA AD 2020-0149Landing Gear — Nose Landing Gear Door Attachment Bolts — Replacement
Get the next one by email
New ADs and bulletins for Saab Ab 2000 and SAAB 2000, summarized like this page, every Monday.