Fuselage — Underbelly Tank Fuel Sump Electrical Bonding — Modification
- Published
- Effective
AI-generated summary of the official EASA document. Verify against the PDF before acting.
What to do
Operators and maintenance organizations responsible for AW189 helicopters should review the modification instructions and incorporate the electrical bonding changes into their maintenance programs. They should schedule and complete the modification within the timeframe specified by the document, if any. Compliance teams should update their records and ensure all affected aircraft meet the new requirements.
Summary
The document titled 'Fuselage — Underbelly Tank Fuel Sump Electrical Bonding — Modification' applies to LEONARDO S.p.A. HELICOPTERS model AW189. It addresses modifications related to the electrical bonding of the underbelly tank fuel sump on the fuselage of these helicopters. This modification aims to enhance the safety and reliability of the fuel system.
What changed
This document introduces a modification to the electrical bonding system of the underbelly tank fuel sump on the AW189 helicopter fuselage. The change involves updating or installing bonding components to ensure proper electrical continuity and reduce the risk of electrical faults. It is a new modification requirement rather than an amendment to existing regulations.
Why it matters
This modification is important for aviation professionals because it directly impacts the safety and airworthiness of the AW189 helicopters. Proper electrical bonding in the fuel sump area helps prevent potential ignition sources, reducing the risk of fuel-related fires or explosions. Operators, maintenance organizations, and compliance teams must ensure this modification is implemented to maintain regulatory compliance and operational safety.
More for Leonardo S.P.A. Helicopters AW189
All 45- EASA AD 2020-0271R1Main Rotor – Swashplate Boot – InspectionOct 8, 2026
- EASA AD 2026-0192Fuselage – Tail Gearbox Fitting – InspectionOct 6, 2026
- EASA PAD 26-115Tail Rotor – Damper Bracket – InspectionSep 24, 2026
- EASA AD 2026-0004Time Limits / Maintenance Checks — Airworthiness Limitations Section — AmendmentJan 13, 2026
- EASA AD 2025-0213Power Plant — Engine Mount Fitting — Inspections / ReplacementSep 26, 2025
Get the next one by email
New ADs and bulletins for Leonardo S.P.A. Helicopters AW189 and AW189, summarized like this page, every Monday.